Metro system

Metro monitoring is carried out to assess the stability of tunnels and supporting structures, as well as ground movements.

Naples Metro, Poggioreale-Capodichino line

2 km

Length

2020

Start of work

4 anni

Duration of work

2026

Start of train circulation

The project, for which we provided monitoring instrumentation throughout the excavation phase, will connect Naples city centre with the international Capodichino airport, and is an integral part of the project to upgrade Line 1 of the Naples Metro, the next chapter in the city’s public transport transformation plan.

Doha Metro, Red Line
2016

Start of work

2019

Completion of work

120 mln €

Costo Estimated cost

The Red Line of the Doha metro connects the city from the north, terminating at Lusail in the south. It is also known as the “coastal line”, because long sections of the route run alongside the coast of the Persian Gulf. Again, we provided specific instrumentation for metro monitoring during the execution of the work.

Metropolitana di Doha linea rossa disegno a matita
Milan Metro Line 4, Linate-San Cristoforo section
15 km

Length

2012

Start of of work

2024

Completion of work

2,3 mld €

Estimated cost

La linea M4 di Milano, lunga 15 km e dotata di 21 stazioni, collega l’aeroporto di Linate al quartiere di San Cristoforo, attraversando il centro storico della città. La tratta, interamente sotterranea, è stata realizzata con un sistema di automazione integrale driverless, consentendo una frequenza di servizio elevata e una riduzione dei tempi di percorrenza.

Metropolitana linea 4 Milano disegno a matita
Rome metro B1 line

Italy

London metro

Great Britain

Warsaw metro

Poland